A holistic assessment of the photovoltaic-energy storage-integrated charging station

Economic and environmental analysis of coupled PV-energy storage-charging station considering location and scale Appl. Energy, 328 ( 2022 ), Article 119680, 10.1016/j.apenergy.2022.119680 View PDF View article View in Scopus Google Scholar

Environmental Scoping Report (Esr) for a Fuel Storage Facility

Ocean Bunker Petroleum Services hereby submit an application for an Environmental Clearance Certificate (ECC) for the proposed construction of a Diesel

Environmental Scoping Report (Esr) for a Fuel Storage Facility (Diesel Depot = 92 Cubic), on Erf 163, Lafrenz, Windhoek

ENVIRONMENTAL SCOPING REPORT (ESR) Photo for illustration only (Karibib Police Station) ENVIRONMENTAL SCOPING REPORT (ESR) FOR A FUEL STORAGE FACILITY (DIESEL DEPOT = 92 CUBIC), ON

ENVIRONMENTAL MONITORING AND EVALUATION REPORT

The following environmental monitoring and evaluation report was compiled by Nam Geo-Enviro Solutions (NGS) on behalf of Puma Energy Namibia to assess the current

PROPOSED NEW FUEL RETAIL FACILITY IN ROCKY CREST TOWNSHIP, IN WINDHOEK

P.O. Box 101, Windhoek Tel: +264-61 270 1111 Fax: +264-61 230 269 Eino.Uwanga@vivoenergy . This document is for the use of Vivo Energy Namibia Ltd only and may not be transmitted to any other party, in whole or in part, in any form without written consent permission of Matrix Consulting Services.

Namibia''s Environmental Impact Assessment Tracker

Baker Hughes Energy Services Namibia (Pty) Ltd. 5 July 2024. [1044] See full details. Environmental Impact Assessment process for the proposed minerals prospecting and small-scale mining activities within Mining Claims (MCs) 71836 and 71837, Daweb Constituency, Hardap Region.

guidelines for LICENCE APPLICATIONS

The Schedule of Approved Tariffs provides for the tariff and indexation/tariff approval regime. The template schedule is published on the Regulator''s website.

ENVIRONMENTAL MONITORING AND EVALUATION REPORT

The overall monitoring and evaluation findings of the operations of Henadava service station are in accordance with the SABS/SANS and Ministry of Mines and Energy standards and

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR THE DEVELOPMENT OF A SERVICE STATION (AK PLAZA SERVICE STATION

and, a copy send to the Environmental Assessment Practitioner. Report status: Final Environmental Impact Assessment report Proponent: Namaza Investments cc CC/2009/3926 P.O. Box 7227, Swakopmund Tel: 064 400 550 Cell: 085 1 851126

ENVIRONMENTAL MONITORING AND EVALUATION REPORT FOR THE OPERATIONS OF THE EXISTING SOWETO SERVICE STATION IN KATUTURA, WINDHOEK

SOWETO SERVICE STATION IN KATUTURA, WINDHOEK, KHOMAS REGION CONSULTANT: NAM GEO-ENVIRO SOLUTIONS P.O. BOX 3343 Windhoek Tel/fax: +264(61) 402246 Email: info@geoenvirosol PROPONENT: PUMA ENERGY NAMIBIA

Namibia: Energy Storage Regulatory Framework On Its Way

15 April 2021. The Namibian (Windhoek) By Nghinomenwa Erastus. CONTEMPORARY electricity storage would enhance Namibia''s intermittent renewable power-generation

Faul A, Strauss J; Bosman Q; 2023 November; Protea

To protect the environment and achieve sustainable development, all projects, plans, programmes and policies deemed to have adverse impacts on the environment require

SCOPING REPORT: ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF A FUEL RETAIL FACILITY ON Erf 8002, Windhoek

Prepared by: Prepared For: PADDOCK INVESTMENT CC P.O. Box 11485 Klein Windhoek, Namibia SCOPING REPORT: ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF A FUEL RETAIL FACILITY ON ERF 8002

ENVIRONMENTAL ASSESSMENT FOR UPGRADING AND RENOVATIONS FOR THE FLEET MANAGEMENT FUEL STATION FOR CITY OF WINDHOEK

Operational ESMP for the Existing Fuel Station – CoW Fleet Management, Windhoek, Namibia Page iv LIST OF APPENDICES: Appendix A: Curriculum Vitae of Environmental Assessment Practitioner Appendix B: Hydrogeological Specialist Study Appendix C: Background Information Document Distribution List

REPUBLIC OF NAMIBIA NAMIBIA''S ENVIRONMENTAL ASSESSMENT POLICY FOR SUSTAINABLE DEVELOPMENT AND ENVIRONMENTAL

WINDHOEK. Tel.(061) 2842185 Fax.(061) 229936 1 December 1994. NAMIBIA''S ENVIRONMENTAL ASSESSMENT POLICY. Like its well known Constitution, Namibia''s Environmental Assessment policy has been acclaimed both within the country and internationally. It was approved in August 1994 by Cabinet Resolution 16.8.94/002.

ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR THE OPERATION OF THE EXISTING PUMA KLEIN WINDHOEK SERVICE STATION IN WINDHOEK

1 1 TRODUCTION Puma Energy Namibia Pty (Ltd) intends to regularize the operation of existing Puma Klein Windhoek Service Station in accordance with the Environmental Management Act No. 7 of 2007, which specifies that the construction and operations of

ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR THE

Puma Energy Namibia Pty (Ltd) intends to regularize the operation of existing Munitenge service station in accordance with the Environmental Management Act No. 7 of 2007,

ENVIRONMENTAL MONITORING AND EVALUATION REPORT FOR THE OPERATIONS OF THE EXISTING HENADAVA SERVICE STATION IN KATUTURA, WINDHOEK

HENADAVA SERVICE STATION IN KATUTURA, WINDHOEK, KHOMAS REGION CONSULTANT: NAM GEO-ENVIRO SOLUTIONS P.O. BOX 3343 WINDHOEK TEL/FAX: +264(61) 402246 Email: info@geoenvirosol PROPONENT: PUMA ENERGY

Energy NL Welcomes Environmental Assessment Approval of Project Nujio''qonik

Project Nujio''qonik was registered for environmental assessment with the Government of Newfoundland and Labrador on June 21, 2022 and approved April 9, 2024. The environmental assessment process included an opportunity for public comments and Energy NL was pleased to support the project. Details on Project Nujio''qonik can be

ENVIRONMENTAL MANAGEMENT PLAN (EMP)

VIVO Energy Namibia Ltd. P.O. Box 101, Windhoek Tel: +264-61 270 1111 Fax: +264-61 230 269 Eino.Uwanga@vivoenergy . This document is for the use of VIVO Energy Namibia Ltd and AGRA Namibia only and may not be transmitted to any other party, in whole or in part, in any form without written consent permission of Matrix Consulting

TRANSNAMIB WINDHOEK RAIL STATION

The EMP is a living document that must be prepared in detail, and regularly updated, by the Proponent as the project progress and evolve. The EMP and ECC must be communicated to the site managers. A copy of the ECC and EMP should be kept on site. All monitoring results must be reported on as indicated.

REPUBLIC OF NAMIBIA NAMIBIA''S ENVIRONMENTAL

It was approved in August 1994 by Cabinet Resolution 16.8.94/002. The Environmental Assessment (EA) policy was developed and refined through a lengthy process of cross

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR THE DEVELOPMENT OF A SERVICE STATION

Ondonga Service Station – Kuisebmund is planned for a parcel of land situated on erf 7214, Kuisebmund, Walvis Bay GPS Position: 22°55''30.5"S 14°32''25.7"E. The envisioned project entails the construction of a standard service station with 4 dispensing pumps (petrol and diesel) with 2 double walled Underground Storage Tanks of 45 cubic metres.

ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR THE OPERATION OF THE EXISTING SOWETO SERVICE STATION IN KATUTURA, WINDHOEK

STATION IN KATUTURA, WINDHOEK, KHOMAS REGION PREPARED BY: NAM GEO-ENVIRO SOLUTIONS P.O. BOX 3343 WINDHOEK TEL/FAX: +264(61) 402246 Email: info@geoenvirosol PREPARED FOR: PUMA ENERGY NAMIBIA Pty (Ltd)

CONSTRUCTION AND OPERATIONS OF A FUEL RETAIL FACILITY IN ROCKY CREST, WINDHOEK ENVIRONMENTAL SCOPING ASSESSMENT

APP-002386 CONSTRUCTION AND OPERATIONS OF A FUEL RETAIL FACILITY IN ROCKY CREST, WINDHOEK ENVIRONMENTAL SCOPING ASSESSMENT REPORT Assessed by: Assessed for:EXECUTIVE SUMMARY Tulaing Petroleum (Pty) Ltd

ENVIRONMENTAL MONITORING AND EVALUATION REPORT FOR THE OPERATIONS OF THE EXISTING PUMA EROS SERVICE STATION IN EROS, WINDHOEK

PUMA EROS SERVICE STATION IN EROS, WINDHOEK, KHOMAS REGION CONSULTANT: NAM GEO-ENVIRO SOLUTIONS P.O. BOX 3343 WINDHOEK TEL/FAX: +264(61) 402246

ENVIRONMENTAL MONITORING AND EVALUATION REPORT FOR THE OPERATIONS OF THE EXISTING NELSON MANDELA SERVICE STATION IN WINDHOEK

NELSON MANDELA SERVICE STATION IN WINDHOEK, KHOMAS REGION PREPARED BY: NAM GEO-ENVIRO SOLUTIONS P.O. BOX 3343 WINDHOEK TEL/FAX: +264(61) 402246 Email: info@geoenvirosol PREPARED FOR: PUMA ENERGY P.O

APP-00716 OPERATIONS OF ETUNDA SERVICE STATION ENVIRONMENTAL

9.4 "The storage and handling of a dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location." (Total storage capacity for fuel is 92 m3). is a filling station that stores diesel and unleaded petrol below ground.)

Microsoft Word

1. Introduction. Tulaing Petroleum (Pty) Ltd (the Proponent) intends to construct and operate a new fuel retail facility at the corner of Long Island Street and Seal Island Road in Rocky Crest, Windhoek. The facility will be situated on erf 1464 and will host a forecourt area with pump islands underneath an overhead canopy, underground tanks

Power-to-What? – Environmental assessment of energy storage systems

– Environmental assessment of energy storage systems A. Sternberg and A. Bardow, Energy Environ. Sci., 2015, 8, 389 DOI: 10.1039/C4EE03051F To request permission to reproduce material from this article, please go to the .

Wallerawang Battery Energy Storage System | Planning Portal

Message. To Department of Planning Lithgow, 6 March 2022 Ref.: Wallerawang Battery Energy Storage System SSD-14540514 We would like to express our support for the Development Consent of the above project for the following reasons: • The proposed battery storage of electricity forms a vital part of the development of renewable energy.

ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR THE OPERATION OF THE EXISTING PUMA EROS SERVICE STATION IN EROS, WINDHOEK

STATION IN EROS, WINDHOEK, KHOMAS REGION PREPARED BY: NAM GEO-ENVIRO SOLUTIONS P.O. BOX 3343 WINDHOEK TEL/FAX: +264(61) 402246 Email: info@geoenvirosol PREPARED FOR: PUMA ENERGY NAMIBIA Pty (Ltd) P.O

GOREANGAB WATERFRONT SERVICE STATION WINDHOEK

1 INTRODUCTION True-Gem Investment CC requested Geo Pollution Technologies (GPT) to update their Environmental Management Plan (EMP) for the existing Goreangab Waterfront Service Station, Windhoek. The facility is situated on erf 77 GG off

ENVIRONMENTAL ASSESSMENT FOR UPGRADING AND RENOVATIONS FOR THE FLEET MANAGEMENT FUEL STATION FOR CITY OF WINDHOEK

TITLE: Environmental Assessment for the Upgrading and Renovations for the Fleet Management Fuel Station for City of Windhoek, Khomas Region, Namibia AUTHORS: Ms. Ruth Nuujoma Ms. Maria Shimhanda CLIENT: Om''kumoh ConsultingWindhoek)